丹绒士拔华小
-
sjkc tanjung sepat 08
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-08.jpg
-
sjkc tanjung sepat 07
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-07.jpg
-
sjkc tanjung sepat 06
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-06.jpg
-
sjkc tanjung sepat 05
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-05.jpg
-
sjkc tanjung sepat 04
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-04.jpg
-
sjkc tanjung sepat 03
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-03.jpg
-
sjkc tanjung sepat 02
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-02.jpg
-
sjkc tanjung sepat 01
https://commchest.org.my/cn/wp-content/uploads/2019/11/sjkc-tanjung-sepat-01.jpg
地点 |
雪兰莪丹绒士拔 |
类型 |
华小 |
工程完竣 |
2018年5月 |
捐款 |
RM1,000,000 |
学生人数 |
641名学生(2019年招生) |
这所学校建立于60年代,位于丹绒士拔的渔村内。这所全津贴学校拥有1座单层楼5间课室,建立于60年代,称之为E 座和一座木板建造的食堂。
学校建议拆除E座旧楼,并建造一座新的2层楼高的大楼,其中包括一个供学生使用的食堂,教师饭厅,储藏室,厨房和厕所。
这所新校楼被命名为“公益金楼”,于2017年8月25日获得了《实用竣工证书》,并于2018年5月2日获得了《竣工与合规证书》。
目前该校的四年级学生被安排在新的教室上课,并在该1楼设有一个新图书馆。学生食堂,厨房,储藏室和教师饭厅位于公益金大楼的底层。