新华华小
-
sjkc sin hua 09
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-09.jpg
-
sjkc sin hua 08
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-08.jpg
-
sjkc sin hua 07
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-07.jpg
-
sjkc sin hua 06
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-06.jpg
-
sjkc sin hua 05
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-05.jpg
-
sjkc sin hua 04
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-04.jpg
-
sjkc sin hua 03
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-03.jpg
-
sjkc sin hua 02
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-02.jpg
-
sjkc sin hua 01
https://commchest.org.my/cn/wp-content/uploads/2021/04/sjkc-sin-hua-01.jpg
地点 |
森美兰芙蓉 |
类型 |
华小 |
工程完竣 |
2021年1月31日 |
捐款 |
RM196,055 |
学生人数 |
917名学生(2020年招生) |
新华小学经常面对电源跳闸问题。有鉴于此,公共工程部于2018年4月18日进行了一项电压调查,JKR Laporan Pepasangan Elektrik报告指出该校的有些电线在扩建校舍时没做正当的接驳和已严重损坏,因而需要更换总配电闸。
公益金资助该校进行电流测试,平衡电压,更换主配电闸,重新配电和按装分配电闸,为A,B,C三座教学楼进行电线重新接驳工作。
此外,公益金还为A,B和C的三栋教学楼所有课室以及教师室提供并安装了新的电灯,电吊风扇和电源插头。