美罗中华中学
-
SMJK Choong Hua 05
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-05.jpg
-
SMJK Choong Hua 04
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-04.jpg
-
SMJK Choong Hua 03
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-03.jpg
-
SMJK Choong Hua 02
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-02.jpg
-
SMJK Choong Hua 01
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-01.jpg
-
SMJK Choong Hua 10
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-10.jpg
-
SMJK Choong Hua 09
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-09.jpg
-
SMJK Choong Hua 08
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-08.jpg
-
SMJK Choong Hua 07
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-07.jpg
-
SMJK Choong Hua 06
https://commchest.org.my/cn/wp-content/uploads/2025/02/SMJK-Choong-Hua-06.jpg
地点 |
霹雳州 美罗 |
类型 |
中学 |
工程完竣 |
2024 年 6 月 6 日 |
捐款 |
RM1,093,200 |
学生人数 |
752 (2024) |
由于教室数量不足,学生被分为两个上课时段。目前,中三至中五的学生参加上午时段,而中一和中二的学生参加下午时段。
学校计划在2025年前实行单一上课时段,以响应教育部的指示。因此,学校拆除了篮球场,并新建了一栋三层教学楼,该楼设有14间教室,并在底层配备了厕所和篮球场。
这栋名为“公益金大楼”的建筑于2023年3月29日获得了实际竣工证明(CPC),并于2024年6月6日取得了完工和合格证书(CCC)。
此外,公益金为教室配备了4台70英寸的SHARP多媒体教学系统,并为学校计算机实验室提供了10台台式电脑。
社区公益大楼于2024年12月14日举行了落成仪式。