SJK(C) Chi Man
-
P10 Roof After
https://commchest.org.my/wp-content/uploads/2012/04/P10-Roof-After.jpg
-
P09 Roof Before
https://commchest.org.my/wp-content/uploads/2012/04/P09-Roof-Before.jpg
-
P08 Roof After
https://commchest.org.my/wp-content/uploads/2012/04/P08-Roof-After.jpg
-
P07 Roof Before
https://commchest.org.my/wp-content/uploads/2012/04/P07-Roof-Before.jpg
-
P06 Roof After
https://commchest.org.my/wp-content/uploads/2012/04/P06-Roof-After.jpg
-
P05 Roof Before
https://commchest.org.my/wp-content/uploads/2012/04/P05-Roof-Before.jpg
-
P04 Roof Before
https://commchest.org.my/wp-content/uploads/2012/04/P04-Roof-Before.jpg
-
P03 Roof Before
https://commchest.org.my/wp-content/uploads/2012/04/P03-Roof-Before.jpg
-
P02 Chi Man
https://commchest.org.my/wp-content/uploads/2012/04/P02-Chi-Man.jpg
-
P01 Chi Man
https://commchest.org.my/wp-content/uploads/2012/04/P01-Chi-Man.jpg
Location |
Sentul, Kuala Lumpur |
Category |
Chinese Primary School |
Completion |
June, 2012 |
Donation |
RM200,000 |
No of students |
500 students (Year 2011 intake) |
This school was established in year 1918 and has more than 90 years’ history. Presently it has 3 buildings, the oldest of which was rebuilt in 1950 after World War II. We are funding the renovation and repair of the ceiling of the assembly hall, as well as the upgrading of the existing cement flooring at the assembly area to a multi-purpose sports flooring system. Both the existing ceiling and flooring posed danger and was unsafe to the students who are carrying out activities at the assembly area. This project will be done in two phases of which the first phase of upgrading the ceiling of the assembly hall was completed in December 2011.