SJK(T) Methodist
-
8b. SJK (T) METHODIST, IPOH - Staircase after
https://commchest.org.my/wp-content/uploads/2012/04/8b.-SJK-T-METHODIST-IPOH-Staircase-after.jpg
-
8a. SJK (T) METHODIST, IPOH - Staircase before
https://commchest.org.my/wp-content/uploads/2012/04/8a.-SJK-T-METHODIST-IPOH-Staircase-before.jpg
-
7b. SJK (T) METHODIST, IPOH - Cover up circuit board after
https://commchest.org.my/wp-content/uploads/2012/04/7b.-SJK-T-METHODIST-IPOH-Cover-up-circuit-board-after.jpg
-
7a. SJK (T) METHODIST, IPOH - Cover up circuit board before
https://commchest.org.my/wp-content/uploads/2012/04/7a.-SJK-T-METHODIST-IPOH-Cover-up-circuit-board-before.jpg
-
6b. SJK (T) METHODIST, IPOH - Ceiling after
https://commchest.org.my/wp-content/uploads/2012/04/6b.-SJK-T-METHODIST-IPOH-Ceiling-after.jpg
-
6a. SJK (T) METHODIST, IPOH - Ceiling before
https://commchest.org.my/wp-content/uploads/2012/04/6a.-SJK-T-METHODIST-IPOH-Ceiling-before.jpg
-
5b. SJK (T) METHODIST, IPOH - Electrical circuit board after
https://commchest.org.my/wp-content/uploads/2012/04/5b.-SJK-T-METHODIST-IPOH-Electrical-circuit-board-after.jpg
-
5a. SJK (T) METHODIST, IPOH - Electrical circuit board before
https://commchest.org.my/wp-content/uploads/2012/04/5a.-SJK-T-METHODIST-IPOH-Electrical-circuit-board-before.jpg
-
4b. SJK (T) METHODIST, IPOH - Window grill after
https://commchest.org.my/wp-content/uploads/2012/04/4b.-SJK-T-METHODIST-IPOH-Window-grill-after.jpg
-
4a. SJK (T) METHODIST, IPOH - Window grill before
https://commchest.org.my/wp-content/uploads/2012/04/4a.-SJK-T-METHODIST-IPOH-Window-grill-before.jpg
-
3b. SJK (T) METHODIST, IPOH - Rainwater gutter after
https://commchest.org.my/wp-content/uploads/2012/04/3b.-SJK-T-METHODIST-IPOH-Rainwater-gutter-after.jpg
-
3a. SJK (T) METHODIST, IPOH - Rainwater gutter before
https://commchest.org.my/wp-content/uploads/2012/04/3a.-SJK-T-METHODIST-IPOH-Rainwater-gutter-before.jpg
-
2b. SJK (T) METHODIST, IPOH - Root insulation after
https://commchest.org.my/wp-content/uploads/2012/04/2b.-SJK-T-METHODIST-IPOH-Root-insulation-after.jpg
-
2a. SJK (T) METHODIST, IPOH - Root insulation before
https://commchest.org.my/wp-content/uploads/2012/04/2a.-SJK-T-METHODIST-IPOH-Root-insulation-before.jpg
-
1. SJK (T) METHODIST, IPOH - School name
https://commchest.org.my/wp-content/uploads/2012/04/1.-SJK-T-METHODIST-IPOH-School-name.jpg
Location |
Buntong, Ipoh, Perak |
Category |
Tamil Primary School |
Completion |
February, 2012 |
Donation |
RM99,600 |
No of students |
232 students (Year 2011 intake) |
Founded in 1948, the school was relocated and rebuilt in 1998 using steel materials sponsored by JKR, Ipoh. The school has 11 classrooms, 1 library, 1 science lab and 1 hall. However the roof and fittings for the building have deteriorated and needed repair works, which required funding. The school faced problems during rainy days, with leaking roofs in classrooms & hall and rain water splashing into corridors and staircases, making them very hazardous to students and teachers. We therefore funded the repair works for the leaking metal roof, roof insulation and ceilings of the classrooms, and also repaired the electrical circuit board and added additional security measures to the school.