Location | Johor Baharu, Johor |
Category | Primary School |
Completion | 21 March 2025 |
Donation | RM46,400 |
No of students | 2,634 |
The school has a total of 7 blocks of school buildings which was completed over a span of 20 years (1989-2009). Presently, the school has 2 sessions to accommodate more than 2,600 students. Standard 1 and Standard 2 students attend the afternoon session and the remaining students (Standard 3 till Standard 6) attend the morning session.
Block C (one block of 2-storey classroom) and Block D (one block of 3-storey classroom) buildings completed in 1994 and 1995 respectively, requires a new facelift, particularly the roof section.
TCC upgraded the roof of these 2 blocks of buildings, Block C and Block D, to ensure the buildings are safe for students’ use.