SK Sungai Nyior
-
sk sungai nyior 12
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-12.jpg
-
sk sungai nyior 11
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-11.jpg
-
sk sungai nyior 10
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-10.jpg
-
sk sungai nyior 09
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-09.jpg
-
sk sungai nyior 08
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-08.jpg
-
sk sungai nyior 07
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-07.jpg
-
sk sungai nyior 06
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-06.jpg
-
sk sungai nyior 05
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-05.jpg
-
sk sungai nyior 04
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-04.jpg
-
sk sungai nyior 03
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-03.jpg
-
sk sungai nyior 02
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-02.jpg
-
sk sungai nyior 01
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-01.jpg
-
sk sungai nyior 13
https://commchest.org.my/wp-content/uploads/2020/01/sk-sungai-nyior-13.jpg
Location |
Butterworth, Penang |
Category |
Primary School |
Completion |
January 2020 |
Donation |
RM180,145 |
No of students |
100 (2020 intake) |
The Finance Minister, YB Lim Guan Eng visited SK Sungai Nyior on 16 June 2019 and the school’s 2 blocks of Classroom buildings damaged conditions due to termite attack was featured.
TCC assisted to demolish the existing asbestos roofs and replace with new metal deck roofs for Block A and Block B Classroom buildings. In addition, three sets of turbine attic ventilators were installed at the canteen to resolve the poor ventilation and the canteen ceiling boards were re-painted.
Since its establishment in 1989, the school has been using fluorescent tubes in their classrooms. TCC proposed to upgrade the classrooms with LED lightings to create a more conducive learning environment for the students. TCC replaced the damaged naco windows at the teachers’ room with aluminum louvre windows.
TCC refurbished the school’s toilets by installing aluminum sun shade louvre panels to provide privacy at the toilet entrances, replacing damaged ceiling boards and window panels and provided additional lightings and ceiling fans.