Completed Projects

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
Filter by Categories
In The News
Press Releases

SMJK Choong Hua

“The Community Chest Building”, received its Certificate of Practical Completion (“CPC”) on 29 March 2023 and its Certificate of Completion and Compliance (“CCC”) on 6 June 2024. In addition, TCC furnished the classrooms with 4 units of 70’ SHARP Education Solution smartboards and 10 units of desktops for the school’s computer lab. Continue reading

SJK(C) Mambang Diawan

TCC donated a total of 3 units of SHARP Education Solution smartboards for pre-school, Standard 3 and Standard 4 students enabling these students to experience interactive learning in the classrooms. Continue reading

SJK(C) Man Ming

TCC fully sponsored the construction of a new block of 2-storey building comprising of 6 rooms to cater to the school’s requirement. The construction works commenced in April 2017 and the new building obtained its Certificate of Practical Completion (“CPC”) on 27 September 2017. In 2024, TCC donated 1 unit of SHARP Education Solution smartboard which was placed in the computer lab as the school is using whiteboard as teaching aid in their academic classrooms. Continue reading

SJK(C) Union

TCC furnished a total of 23 units of new desktops to ensure each student has access to a desktop during class in session Continue reading

SJK(C) Rimba Panjang

TCC assisted with hacking of existing concrete flooring, place wire mesh and new concrete flooring with tile line marking. In addition, TCC upgraded the school’s science lab with renovated lab tables and procurement of cabinets to transform learning in the lab. Continue reading

SJK(C) Simpang Jalong

TCC equipped the computer lab with 28 sets of wooden tables and chairs, and 30 sets of wooden tables and chairs for Standard 3 classroom. Metal swing doors cupboards were also placed in the computer lab, rehabilitation classroom and administration office. Continue reading

SJK(C) Kuo Min Nilai

The school expanded its canteen with a metal deck roof, but water seepage made it unsafe. TCC replaced the roof and installed a rainwater gutter, ensuring safe use for students. Continue reading

SK Besout 5

TCC donated a total of 3 units of SHARP Education Solution smartboards and each unit placed in the school library, meeting room and computer lab. Continue reading

SK Besout 4

TCC donated a total of 2 units of SHARP Education Solution smartboards and each unit placed in the school hall and school library. Continue reading